Main Menu

Installation of New HVAC System Begins

Between March and August of this year the installation of a new HVAC system will take place. HVAC stands for heating, ventilation, and air conditioning. The HVAC system has not been changed since 1963. The work is primarily done “behind the scenes” in the 1st floor Administrative area and will not affect patron services.

Here is a photo of the 50 year old boiler:

old boiler

And here is a photo of the boiler in pieces:

boiler-in-pieces

In the meantime, temporary heating and cooling units will be installed. We’re looking forward to a more efficient system in the near future.

Share on Facebook0Share on Google+0Tweet about this on Twitter0Pin on Pinterest0Share on TumblrEmail this to someone

,

No comments yet.

Leave a Reply